What is the lead time and how long does installation take?
As all our glass verandas are made to measure and there is a manufacturing lead time after ordering, which varies by brand, size, specification and the season.
Typical time from ordering to installation is around 4-6 weeks and longer for larger more complex shapes and sizes.
It is possible to provide some standard verandas and turn around in less time with limited colours and size options.
Installation on site typically takes 1–3 days depending on the size and groundwork prepared or not.
We’ll give you a current lead time and an installation timescale when you order.